Skip to content

Rehabs, permits and sequencing

A General Contractor for Older Homes in East Point, GA

East Point's permit office publishes unusually clear rules about who may pull a permit and in what order a rehab gets inspected. Those rules, along with a housing stock that is half pre-1970, explain what hiring a general contractor here actually involves.

East Point at a Glance

Location
7.3 miles southwest of central Atlanta (straight line)
County
Fulton County
Population (2023 estimate)
38,115
Housing units
18,799
Median year homes were built
1970
Owner-occupied homes
44%
Detached single-family homes
52%
Built before 1970
51%
Built 2010 or later
7%

Sources: US Census Bureau 2023 Gazetteer, Vintage 2023 population estimates, and American Community Survey 2023 5-year estimates for the place. County is taken at the place’s center point; some communities extend into other counties.

Map of the 40-mile radius around Atlanta with East Point marked.
Straight-line 40-mile radius measured from the city center. Map outlines: US Census Bureau.

Half the houses, several trades, one schedule

Census estimates put about 51% of East Point’s 18,799 housing units before 1970: 35% from 1950 to 1969 and another 16% older still. The median year built is 1970. Only 7% of units date from 2010 or later, which means most jobs here are not new builds but changes to something that already has a history.

That shapes the job of a general contractor East Point GA owners might call. Replacing one water heater is a single-trade visit. Opening a wall in a 1958 house often isn’t, because the wall may hold wiring, supply lines and a vent, and the moment it is open, the plumber, electrician, mechanical sub and inspector all have a stake in what happens next. Somebody has to decide who goes first, who waits, and when the wall can close.

The city’s history gives some sense of how long this has been going on. The name comes from the eastern end of the Atlanta and West Point Railroad, the settlement was founded in 1870 as a terminus, and its first charter came in 1887. So the older 16% of today’s housing sits on land that had been changing hands and filling in for generations before the postwar houses arrived.

This page walks through what matters before you sign anything: the city’s permit-holder rules, the inspection order, the likely trouble spots in a house of this age, and what changes when the building is a rental or a storefront.

Who is allowed to pull the permit

East Point’s permit reference guide, updated in December 2025, sorts applicants into three kinds of permit holder. Read it before you agree to any arrangement about who handles the paperwork.

Homeowner

A homeowner’s permit is for owners doing the work themselves, with family and friends, and not paying a company. Hire a company and the permit moves to that company. Applicants upload a state ID, a notarized affidavit and proof of ownership, such as a tax bill or a recorded deed.

Contractor

The guide’s list covers general, electrical, HVAC and plumbing contractors, among others, who hold a state card. They upload the state card, ID and a current Georgia business license.

Specialty trade

Roofers, window, fence and siding-only installers and certain handyman trades fall here. They don’t need a state card, but the business license has to show that the company does that type of work.

Two practical points follow. First, be careful with any offer along the lines of pulling the permit in your name to save time. Under the city’s own description, a homeowner’s permit doesn’t fit work you are paying a company to do. Second, if someone other than the permit holder applies, the city wants a notarized Authorized Agent Form specific to that project and address. The guide also notes that an agent’s approval covers submitting and receiving the permit, not requesting inspections, unless the holder grants that access through their own login.

The Department of Planning and Community Development runs four divisions: Permits, Building Inspections, Planning and Business Licenses. Rezoning, variance and special-use questions go through its planning side, so ask early if your plan changes how a lot is used. Rules change, and this summary is not legal advice. Confirm what applies to your address with the department.

How inspections run on a rehab house

The city’s building inspections page lists a sequence for a rehab house. The order can vary with the job, but this is the outline it gives:

Mechanical, electrical or plumbing rough

Trade work gets looked at while it is still exposed.

Framing rough

Structure comes after the trades have run their lines through it.

Insulation

A separate look before wallboard goes up.

Temporary electrical power

Listed as its own stage on the city’s sequence.

Mechanical, electrical or plumbing final

Fixtures and equipment are in and working.

Building final

The last sign-off on the permit.

This list explains a lot of frustration on remodels. The page says work should not move past an inspected stage without approval, and that drywall covering uninspected work has to come off. Requests go through the BS&A online portal, and reinspection fees apply when access, plans or prior corrections are missing. In an occupied home, the owner or an authorized agent has to be present. If you live in the house during the work, expect to be part of the calendar.

What a house from this period tends to raise

None of this describes your particular address. Many homes have been updated, some several times, and often without any record you can find. These are questions worth asking when a house falls in the 1950 to 1969 group or earlier:

  • Wiring capacity: a panel sized for an earlier household may not comfortably carry a modern kitchen, so have it evaluated by a licensed electrician before finalizing a layout.
  • Supply and drain lines: materials from this era may be near the end of their useful life. Look at what is visible in the crawl space or basement before tiling over a bathroom, and bring in our plumbing services if you are unsure.
  • Ductwork and equipment: HVAC work is often added to homes never designed for it, leaving long runs or tight chases that matter once you move walls.
  • Lead paint: the EPA’s renovation rule covers paid work that disturbs paint in homes built before 1978, which takes in most of East Point’s older housing. Ask how the work will be contained and cleaned up.
  • Layout: rooms in older homes are frequently smaller and more closed off. If you want something more open, a structural question comes first and a design question second.

For a single room, a kitchen remodel or bathroom update may be a fairly contained job. Once the plan touches three or four rooms, though, it starts to look like whole-home remodeling, and the order of the trades becomes the main thing to get right. Twelve25 writes out a detailed scope with clear pricing before work starts, so you can compare it line by line against any other bid you collect.

The Flint begins near here, so check where water goes

The Flint River begins in East Point, as ground seepage, before it runs under the airport’s runways. It is an interesting bit of geography, though it says nothing about your yard. Being near a headwater doesn’t by itself mean a lot floods or stays dry.

What to do instead is simple. Before planning a foundation repair, an addition or a basement project, look up the address on FEMA’s flood maps, which show how a property relates to higher-risk areas. FEMA also points out that no area counts as no-risk. Then walk the property during a hard rain. Note where the water runs, where it stands, and whether downspouts dump next to the foundation.

On an older house, surface water usually explains more than the map does. Finished grades shift over decades, driveways get added, and neighboring lots get rebuilt. If water stands against the wall, deal with that before spending money on the rooms inside. Exterior jobs such as roofing services and siding and gutter work tend to belong earlier in the plan for that reason. Where limbs hang over a roof and near service lines, the city’s site also has an East Point Power section covering utility tree trimming, which is a sensible first stop.

When the owner isn’t the occupant

Only about 44% of housing units here are owner-occupied, and only 52% are detached single-family houses. A good share of the people planning work are therefore landlords, small investors or owners of attached units, and their priorities differ from those of someone remodeling for themselves.

If you rent out a home built before 1978, the EPA notes that its rule applies to paid renovation work there, and that house flippers are covered too. Tenants in place also raise scheduling questions for the inspection stages described above, because someone has to provide access. And if the job involves a shared wall or multiple units, tell the permit office that up front.

Commercial owners face a separate track, since the city’s chart lists distinct applications for commercial work and certificates of occupancy. Our commercial construction work includes office, retail, restaurant and tenant improvements. Twelve25 is licensed and insured and serves East Point along with the rest of the south metro, including College Park and Hapeville.

Questions specific to East Point

My contractor says the permit can go in my name because it's faster. Is that allowed?

The city’s guide says a homeowner’s permit requires that the owner do the work with family or friends, without paying a company. If you are paying a company, ask why it isn’t holding the permit, and check with the permit office before agreeing.

Does a roofer need a state card to work in East Point?

The guide lists roofers under specialty trades, which it says don’t need a state card but must show a Georgia business license covering that type of work. Confirm the current requirement with the Permits division.

Who schedules the inspector?

The permit holder or their agent makes the request online through the BS&A portal. An agent needs permission from the holder’s own login, so settle who does this before the job begins.

What happens if drywall went up before an inspection?

The inspections page says drywall covering uninspected work must be removed. This is one of the more avoidable costs on a rehab, so nobody should close a wall until the prior stage has passed.

We only need general repairs. Is a permit still involved?

The city’s chart has a Building Permit category for general repairs, and the answer depends on the scope. Send a short description to the Permits division. Request an estimate if you would like the scope itself written out first.

Sources for Local Facts

Let’s Build Something Great Together.

Ready to start your next construction or remodeling project? Tell us about your space and request a free estimate.

Nashville (615) 478-5705Atlanta (770) 669-1314